Every Dock Blocks installation starts with a waterfront problem: a show that has to launch over the water, a boat that needs to come out after every trip, a shoreline that needs a dock without pilings. These are the projects as they were built, with the sizes, the loads and the people who use them.
- Peachtree City moved its Fourth of July fireworks offshore on a 65 × 40 ft Dock Blocks platform: more than 47,000 lbs of fireworks and equipment, moved into place by two jet skis.